集約化管理下電網(wǎng)建設(shè)項目采購問題與對策研究
[Abstract]:In the aspect of procurement, both domestic and foreign, centralized procurement will be the future trend of its development. If the purchasing authority is multilevel, it is impossible to maximize the efficiency and benefit of its core resources. In turn, we can build a centralized procurement system to integrate all the procurement needs of the whole enterprise. In this way, not only can reduce the cost of enterprise procurement, but also improve the quality of enterprise procurement. This paper first introduces the background and significance of the procurement research of power grid construction project, and reveals the necessity of the power supply enterprises to attach importance to procurement. At the same time, it also introduces the domestic and foreign situation of procurement. Then, it introduces the basic theory of purchasing, such as purchasing management theory, comprehensive material planning management theory, power material classification management theory, grid company material classification system construction theory and so on. Then, the paper studies the current situation and problems of power grid construction project procurement, such as current procurement strategy, power cable industry procurement status, transformer industry procurement status, and power grid construction project procurement problems. Then, aiming at the problems in the previous chapter, the paper puts forward some targeted improvement measures to optimize the purchasing activities of power grid enterprises. In this way, the efficiency of material procurement can be further improved, the supply cycle of material procurement will be shortened as far as possible, the win-win relationship with suppliers will be highlighted, and the overall efficiency and benefit of material supply chain management will be enhanced. Finally, the article makes the summary and the prospect.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F426.61;F274
【參考文獻】
相關(guān)期刊論文 前10條
1 馮楊;尹迪;羅兵;;基于SES的不常用備件需求預(yù)測模型[J];兵工自動化;2011年02期
2 劉楊;任德奎;;基于灰色理論的間斷性需求備件預(yù)測方法[J];四川兵工學(xué)報;2011年04期
3 吳娟;;供應(yīng)商快速反應(yīng)能力影響因素及綜合評價研究[J];科技和產(chǎn)業(yè);2010年05期
4 周曉梅;;基于JIT的電力企業(yè)采購管理系統(tǒng)[J];電力建設(shè);2009年03期
5 何力健;何千里;;煉化企業(yè)MES與ERP集成應(yīng)用的研究[J];數(shù)字石油和化工;2007年09期
6 杜洪禮;劉瑞生;;基于供應(yīng)鏈管理的物流快速反應(yīng)系統(tǒng)研究[J];物流科技;2011年02期
7 馬艷軍;;淺談供電物資計劃管理與改進[J];科學(xué)之友;2010年22期
8 趙霞;;我國電線電纜行業(yè)現(xiàn)狀與產(chǎn)品質(zhì)量提升[J];機械工業(yè)標準化與質(zhì)量;2013年02期
9 呂凌楠;;電網(wǎng)企業(yè)設(shè)備大修成本定額管理的探討[J];會計之友;2011年36期
10 幸莉仙;;基于VMI的電力物資超市采購和庫存管理模式研究[J];商場現(xiàn)代化;2008年03期
相關(guān)博士學(xué)位論文 前1條
1 顧煜;物流成本管理研究[D];西南財經(jīng)大學(xué);2010年