a国产,中文字幕久久波多野结衣AV,欧美粗大猛烈老熟妇,女人av天堂

當(dāng)前位置:主頁 > 科技論文 > 路橋論文 >

鋼管混凝土拱橋施工監(jiān)控及吊桿張力控制

發(fā)布時間:2019-06-17 21:44
【摘要】:鋼管混凝土拱橋是一類將梁和拱有機(jī)結(jié)合起來的橋梁結(jié)構(gòu),該結(jié)構(gòu)體系近年來才在我國興起。在施工過程中主梁與拱肋的線形及內(nèi)力、混凝土澆筑時鋼管的溫度應(yīng)力、吊桿的索力值均需要建立合適的施工監(jiān)控體系來加以控制。本文以牟家村跨同三高速公路64m系桿拱橋?yàn)楣こ瘫尘?結(jié)合現(xiàn)有施工監(jiān)控的理論和方法,對各施工階段橋梁的狀態(tài)進(jìn)行了數(shù)據(jù)采集及分析,保證了橋梁成橋后線形、應(yīng)力及吊桿索力符合規(guī)范要求。主要完成的工作內(nèi)容如下:(1)采用橋梁博士對全橋進(jìn)行了有限元模擬,得到各階段主梁與拱肋的理論累計位移,將計算結(jié)果與設(shè)計資料對比,驗(yàn)證了模型的可靠性,在施工過程中,根據(jù)現(xiàn)場材料試驗(yàn)及實(shí)測數(shù)據(jù),對模型中各參數(shù)進(jìn)行調(diào)整,以提高控制精度。(2)采用自適應(yīng)度方法對橋梁進(jìn)行線形監(jiān)控,利用最小二乘法對橋梁主要參數(shù)進(jìn)行識別,并對橋梁各階段變形進(jìn)行預(yù)測,結(jié)合有限元模型給出主梁與拱肋的預(yù)拱度,確定立模標(biāo)高,得到了理想的成橋線形。(3)分析了施工控制中影響應(yīng)力控制的因素,對溫度及收縮徐變的影響進(jìn)行了論述,采用收縮徐變相關(guān)理論,對實(shí)測應(yīng)變中的非荷載應(yīng)變進(jìn)行分離,得到更接近實(shí)際應(yīng)力的應(yīng)力檢測結(jié)果。(4)采用MIDAS/FEA有限元軟件對鋼管混凝土拱肋進(jìn)行有限元模擬,分析在澆筑混凝土過程中,釋放的水化熱以及對鋼管拱肋的影響。結(jié)果表明,鋼管混凝土拱澆筑過程中會釋放大量的水化熱,具有大體積混凝土溫度場的特征。(5)吊桿的索力直接影響著整個橋梁的受力狀態(tài),因而對吊桿索力的識別至關(guān)重要。選擇合適的實(shí)用公式對本橋的吊桿索力進(jìn)行識別,并利用影響矩陣法對本橋吊索進(jìn)行精確調(diào)整,成橋后索力誤差小于5%,證明了影響矩陣法調(diào)索的有效性。
[Abstract]:Concrete-filled steel tubular arch bridge is a kind of bridge structure which combines beam and arch organically, and the structure system has only emerged in our country in recent years. In the construction process, the alignment and internal force of the main beam and arch ribs, the temperature stress of the steel pipe and the cable force of the suspender should be controlled by establishing a suitable construction monitoring system to control the temperature stress of the steel pipe and the cable force of the suspender during concrete pouring. In this paper, taking the 64m tied arch bridge of Moujiacun Tongshan Expressway as the engineering background, combined with the existing construction monitoring theories and methods, the data acquisition and analysis of the state of the bridge in each construction stage are carried out to ensure that the bridge alignment, stress and suspender cable force meet the requirements of the code. The main contents are as follows: (1) the finite element simulation of the whole bridge is carried out by Dr. Bridge, and the theoretical cumulative displacement of the main beam and arch ribs is obtained. The calculated results are compared with the design data to verify the reliability of the model. In the construction process, according to the field material test and measured data, the parameters in the model are adjusted. In order to improve the control accuracy. (2) the adaptive method is used to monitor the bridge alignment, the least square method is used to identify the main parameters of the bridge, and the deformation of each stage of the bridge is predicted. Combined with the finite element model, the pre-arch degree of the main beam and arch ribs is given, the vertical mold standard height is determined, and the ideal bridge alignment is obtained. (3) the factors affecting stress control in construction control are analyzed. The influence of temperature and shrinkage creep is discussed. The non-load strain in the measured strain is separated by using the theory of shrinkage creep, and the stress detection results which are closer to the actual stress are obtained. (4) the finite element simulation of concrete-filled steel tubular arch ribs is carried out by using MIDAS/FEA finite element software, and the hydration heat released and the influence on steel tube arch ribs in the process of pouring concrete are analyzed. The results show that a large amount of hydration heat will be released during the pouring process of concrete-filled steel tubular arch, which has the characteristics of mass concrete temperature field. (5) the cable force of the suspender directly affects the stress state of the whole bridge, so it is very important to identify the cable force of the suspender. The suitable practical formula is selected to identify the cable force of the suspender of the bridge, and the influence matrix method is used to accurately adjust the cable of the bridge. The cable force error is less than 5% after the bridge is completed, which proves the effectiveness of the influence matrix method to adjust the cable.
【學(xué)位授予單位】:煙臺大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U445.4

【參考文獻(xiàn)】

中國期刊全文數(shù)據(jù)庫 前10條

1 江聰聰;;振動頻率法檢測吊桿索力試驗(yàn)研究[J];山西建筑;2017年01期

2 陳寶春;劉福忠;韋建剛;;327座鋼管混凝土拱橋的統(tǒng)計分析[J];中外公路;2011年03期

3 陳亮;岳青;;系桿拱橋吊桿張拉施工控制方法[J];現(xiàn)代交通技術(shù);2011年01期

4 朱小秀;孫九春;;系桿拱橋吊桿各種張拉索力計算方法和比較[J];中國市政工程;2010年03期

5 尹明;;鋼管混凝土系桿拱橋吊桿施工張拉力計算[J];公路工程;2010年02期

6 王毅;葉見曙;;混凝土箱梁懸臂施工中溫度梯度對標(biāo)高影響的分析與控制[J];公路交通科技;2009年08期

7 周志光;;淺談大跨度連續(xù)剛構(gòu)橋梁的施工控制[J];山西建筑;2009年13期

8 陳寶春;;鋼管混凝土拱橋應(yīng)用與研究進(jìn)展[J];公路;2008年11期

9 孟少平;楊睿;王景全;;一類精確考慮抗彎剛度影響的系桿拱橋索力測量新公式[J];公路交通科技;2008年06期

10 陳魯;張其林;吳明兒;;索結(jié)構(gòu)中拉索張力測量的原理與方法[J];工業(yè)建筑;2006年S1期

中國博士學(xué)位論文全文數(shù)據(jù)庫 前1條

1 張治成;大跨度鋼管混凝土拱橋施工控制研究[D];浙江大學(xué);2004年

中國碩士學(xué)位論文全文數(shù)據(jù)庫 前6條

1 王建飛;拱橋吊桿索力的振動法測量[D];哈爾濱工業(yè)大學(xué);2012年

2 許會;多塔斜拉橋理想成橋索力及施工階段索力的確定[D];西南交通大學(xué);2011年

3 張寶安;京滬高鐵滄德特大橋連續(xù)梁施工與監(jiān)控技術(shù)[D];中國地質(zhì)大學(xué)(北京);2010年

4 鄭燦;基于頻率法的索力測試方法及索的損傷研究[D];浙江大學(xué);2008年

5 楊小森;大跨度鋼管混凝土拱橋施工控制[D];北京工業(yè)大學(xué);2007年

6 張弘濤;大跨度鋼管混凝土拱橋設(shè)計方法與施工控制[D];西南交通大學(xué);2006年



本文編號:2501286

資料下載
論文發(fā)表

本文鏈接:http://www.wukwdryxk.cn/kejilunwen/daoluqiaoliang/2501286.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶3a0be***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com
添逼视频| 综合无码精品人妻一区二区三区| 一级毛片免费无码视频| 又爽又黄又无遮挡的视频1000| 碰超| 三级电影网| 亚洲午夜久久久影院| 久久久不卡国产精品一区二区 | 亚洲国产aⅴ综合网| 亚洲熟妇久久精品| 亚洲AV无码成人精品区天堂| 日本av亚洲aⅴ久| 强行糟蹋人妻HD中文字幕| 日本毛茸茸的丰满熟妇| 日韩精品无码久久久久久| 内射干少妇亚洲69xxx| 欧美97| 亚洲另类无码专区首页| 国产成人免费ā片在线观看| 国产成人精品综合久久久久性色 | 国产精品VA无码一区二区| 久久青青草原一区二区| 国产黄a三级三级三级老师| 殇情影院| 特别黄的视频免费播放| 人妻熟妇乱又伦精品视频中文字幕| 69SEX久久精品国产麻豆| 亚洲自偷自拍另类第1页| 亚洲真人无码永久在线| 亚洲av无码一区二区二三区我| 亚洲乱亚洲乱妇20p| 精品丰满熟女一区二区三区| 精品欧美| 懂色av色香蕉一区二区蜜桃| 精品欧美一区二区三区| 人人cao| 波多野结衣av无码| 亚洲av电影| 天堂网www天堂资源网| 国产精品交换| 午夜性刺激免费看视频|