風(fēng)電經(jīng)特高壓線路并網(wǎng)時湖北電網(wǎng)調(diào)峰方案
[Abstract]:Based on the background of Mengxi to Hubei UHV wind power supply in Hubei power grid long-term plan, this paper studies the peak shaving problem of Hubei power grid's consumption of Mengxi UHV power under Fengda mode in 2017. The load characteristics, the power characteristics of the west wind and the peak-shaving capability of the power supply in Fengda typical day Hubei power network are analyzed. A mixed integer linear programming model including thermal power, hydropower, pumped storage and UHV combined peak-shaving optimization was established to minimize the cost of generating electricity in the province, not to abandon the water and peak shaving, and to absorb the UHV power as far as possible. Considering different transmission modes of wind power, the combined peak-shaving optimization model is solved by using CPLEX, and the optimization scheme of coordinated operation of thermal power, hydropower, pumped storage and UHV in Hubei power grid is given. The simulation results show that the negative peak-shaving capacity of Hubei power grid in the low period of load is not enough under Fengda mode in 2017, which requires UHV power to participate in the peak-shaving of Hubei power grid. When UHV is imported by wind power quota, the limit quota of wind power in Hubei Province is 34.
【作者單位】: 武漢大學(xué)電氣工程學(xué)院;湖北省電力公司;
【基金】:國家重點基礎(chǔ)研究發(fā)展計劃項目(973項目)(2012CB215201) 國家自然科學(xué)基金項目(51190105)~~
【分類號】:TM73
【參考文獻】
相關(guān)期刊論文 前10條
1 雷亞洲;與風(fēng)電并網(wǎng)相關(guān)的研究課題[J];電力系統(tǒng)自動化;2003年08期
2 汪寧渤;王建東;何世恩;;酒泉風(fēng)電跨區(qū)消納模式及其外送方案[J];電力系統(tǒng)自動化;2011年22期
3 徐帆;劉軍;張濤;丁恰;涂孟夫;;考慮抽水蓄能機組的機組組合模型及求解[J];電力系統(tǒng)自動化;2012年12期
4 楊正瓴;田勇;張廣濤;林孔元;;相似日短期負荷預(yù)測的非線性理論基礎(chǔ)與改進[J];電網(wǎng)技術(shù);2006年06期
5 遲永寧;劉燕華;王偉勝;陳默子;戴慧珠;;風(fēng)電接入對電力系統(tǒng)的影響[J];電網(wǎng)技術(shù);2007年03期
6 陳炳森;胡華麗;;我國風(fēng)電發(fā)展概況及展望[J];電網(wǎng)技術(shù);2008年S2期
7 張寧;周天睿;段長剛;唐曉軍;黃建軍;盧湛;康重慶;;大規(guī)模風(fēng)電場接入對電力系統(tǒng)調(diào)峰的影響[J];電網(wǎng)技術(shù);2010年01期
8 衣立東;朱敏奕;魏磊;姜寧;于廣亮;;風(fēng)電并網(wǎng)后西北電網(wǎng)調(diào)峰能力的計算方法[J];電網(wǎng)技術(shù);2010年02期
9 侯佑華;房大中;齊軍;李洪波;牛偉;楊濤;;大規(guī)模風(fēng)電入網(wǎng)的有功功率波動特性分析及發(fā)電計劃仿真[J];電網(wǎng)技術(shù);2010年05期
10 張志鋒;徐箭;閆秉科;覃蕓;汪ng;王婉晴;孫元章;;考慮特高壓送風(fēng)電的湖北電網(wǎng)調(diào)峰方案[J];電力自動化設(shè)備;2013年04期
【共引文獻】
相關(guān)期刊論文 前10條
1 黃守道;孫延昭;黃科元;;風(fēng)電機組并網(wǎng)問題研究[J];電力科學(xué)與技術(shù)學(xué)報;2008年02期
2 馬瑞;周志飛;徐慧明;徐曉東;;考慮風(fēng)速特性的動態(tài)電壓崩潰指標(biāo)[J];電力科學(xué)與技術(shù)學(xué)報;2009年02期
3 行舟;李雪明;陳振寰;陳永華;王福軍;趙杰;;甘肅酒泉大型集群風(fēng)電有功智能控制系統(tǒng)的開發(fā)[J];電力科學(xué)與技術(shù)學(xué)報;2011年01期
4 袁越;李強;李群;張新松;;風(fēng)電功率特性分析及其不確定性解決方案[J];電力科學(xué)與技術(shù)學(xué)報;2011年01期
5 嚴(yán)干貴;李鴻博;穆鋼;崔楊;劉玉;;基于等效風(fēng)速的風(fēng)電場等值建模[J];東北電力大學(xué)學(xué)報;2011年03期
6 孫銀鋒;李國慶;顧黎明;韓悅;;含雙饋風(fēng)電機組的配電網(wǎng)潮流分析[J];東北電力大學(xué)學(xué)報;2011年04期
7 李國慶;韓悅;孫銀峰;姜黎莉;;計及異步風(fēng)電機組的電力系統(tǒng)區(qū)域間ATC計算[J];東北電力大學(xué)學(xué)報;2011年04期
8 楊衛(wèi)東;姚建國;楊勝春;;儲能技術(shù)對未來電網(wǎng)發(fā)展的作用分析[J];水電自動化與大壩監(jiān)測;2012年02期
9 柳文;焦培南;馮靜;孔慶顏;孫鳳娟;程延鋒;;電離層參數(shù)的相似日短期預(yù)測方法[J];電波科學(xué)學(xué)報;2010年02期
10 藺紅;晁勤;;等值損耗功率法在風(fēng)電場等值計算中的應(yīng)用[J];電測與儀表;2011年08期
相關(guān)會議論文 前10條
1 張碩;朱莉;杜林;劉永民;梅小麗;;風(fēng)電場集中與分布并網(wǎng)對地區(qū)電網(wǎng)電壓的影響研究[A];經(jīng)濟策論(下)[C];2011年
2 周雪松;李超;馬幼捷;李季;于陽;;自抗擾控制技術(shù)在變速恒頻雙饋風(fēng)力發(fā)電系統(tǒng)中的應(yīng)用[A];第二十九屆中國控制會議論文集[C];2010年
3 吳s,
本文編號:2147017
本文鏈接:http://www.wukwdryxk.cn/kejilunwen/dianlilw/2147017.html