斜坡式碼頭躉船系泊纜繩載荷測量技術(shù)與監(jiān)測預(yù)警系統(tǒng)研究
發(fā)布時間:2018-10-13 17:48
【摘要】:隨著三峽樞紐的建成運行,重慶地區(qū)碼頭作業(yè)水文條件的改變以及船舶的大型化對斜坡式碼頭躉船系留設(shè)施提出了更高的要求。然而斜坡式碼頭躉船系泊纜繩載荷機理相當(dāng)復(fù)雜,除了與風(fēng)、浪、流等環(huán)境因素有關(guān)外,還與船舶噸位、船型、載重量、泊位水深、布纜方式、纜繩技術(shù)狀況、躉船與靠泊船舶的相互作用等一系列因素有關(guān),現(xiàn)有系泊系統(tǒng)理論及纜繩載荷計算方法對于斜坡式碼頭躉船的適用性還有待探討。國外雖然已有成熟的系泊監(jiān)測系統(tǒng)定型產(chǎn)品,但現(xiàn)有斜坡式碼頭躉船專業(yè)化程度不足以直接運用。 為避免斜坡式碼頭躉船出現(xiàn)斷纜事故,造成躉船自身傾覆或失控下漂等嚴(yán)重后果,本文深入分析躉船系泊系統(tǒng)的力學(xué)特性和系泊線特性,討論現(xiàn)有纜繩載荷計算方法及其對于斜坡式碼頭躉船的適用性,剖析船舶纜繩載荷的影響因素;分析振動頻率法測纜繩載荷影響因素及修正,提出了實用的躉船系泊纜繩載荷量測技術(shù),通過現(xiàn)場測試驗證了量測技術(shù)的可行性;選擇基于振動頻率法設(shè)計斜坡式碼頭躉船系泊纜繩載荷監(jiān)測預(yù)警系統(tǒng),并對頻譜分析、預(yù)警值的確定、應(yīng)急響應(yīng)預(yù)案、監(jiān)控預(yù)警系統(tǒng)設(shè)備和流程等關(guān)鍵問題進行了闡述。 振動頻率法不僅具有測試儀器日趨小型化,攜帶方便,容易安裝,可以重復(fù)使用的優(yōu)點,而且其測試精度高,,因此成為斜坡式碼頭躉船在役纜繩載荷測量最適合的方法。在考慮纜繩斜度、彎曲剛度、垂度、兩端約束條件,傳感器附加質(zhì)量,環(huán)境溫度變化影響的情況下,可以通過修正的公式消除影響,測量精度得到進一步的提升,F(xiàn)場實測結(jié)果也證明了振動頻率法確實能夠?qū)崿F(xiàn)對斜坡碼頭纜繩載荷可靠測量,由此設(shè)計出的斜坡式碼頭躉船系泊纜繩載荷監(jiān)測預(yù)警系統(tǒng)也有很高的使用價值。 本系統(tǒng)基于振動頻率法,不依賴快速脫纜鉤進行纜繩載荷的測量,不需要針對碼頭系泊設(shè)備進行專業(yè)性改造,測定結(jié)果精度較高,適用于目前國內(nèi)絕大多數(shù)斜坡碼頭。整套設(shè)備簡單輕便,攜帶安裝均很方便,設(shè)備可重復(fù)使用,除可常設(shè)碼頭以避免躉船纜繩斷纜事故外,還可周轉(zhuǎn)于轄區(qū)各碼頭以優(yōu)化系泊系統(tǒng)或進行系泊系統(tǒng)理論研究。
[Abstract]:With the completion and operation of the three Gorges Project, the changes of hydrological conditions and the large scale of ships in Chongqing have put forward higher requirements for the mooring and retaining facilities of barges on sloping wharves. However, the mooring load mechanism of the barge of sloping wharf is quite complicated. In addition to the environmental factors such as wind, wave and current, it is also related to the ship's tonnage, ship type, deadweight, berth water depth, cable arrangement mode, and the technical condition of the cable. A series of factors are related to the interaction between barges and berthing ships. The applicability of mooring system theory and cable load calculation method to the barge of sloping wharf needs to be discussed. Although mature mooring monitoring system has been developed abroad, the existing sloping wharf barges are not able to be used directly. In order to avoid the cable breakage of barges in sloping wharves and the serious consequences such as overturning or losing control of barges, the mechanical and mooring characteristics of barges mooring system are deeply analyzed in this paper. This paper discusses the existing calculation methods of cable load and its applicability to the barge of sloping wharf, analyzes the influencing factors of the ship's cable load, analyzes the influencing factors and the correction of the cable load measured by the vibration frequency method. A practical mooring load measurement technique for barges is put forward, the feasibility of the measurement technology is verified by field test, the mooring load monitoring and warning system based on vibration frequency method is designed, and the frequency spectrum is analyzed. The key problems such as the determination of early warning value, emergency response plan, monitoring and warning system equipment and flow are expounded. Vibration frequency method not only has the advantages of miniaturization of test instruments, easy to carry, easy to install and can be used repeatedly, but also has high testing accuracy, so it has become the most suitable method for measuring the load of cables in service of barges of sloping wharves. Considering the influence of cable slope, bending stiffness, sag, constraint conditions at both ends, the additional mass of sensor and the change of ambient temperature, the influence can be eliminated by the modified formula, and the measurement precision can be further improved. The field measured results also prove that the vibration frequency method can realize the reliable measurement of the cable load of the slope wharf, and the mooring cable load monitoring and warning system of the sloping wharf lighter designed from this method also has a high practical value. Based on the vibration frequency method, the system does not rely on fast decoupling hooks to measure the cable load, and does not need professional modification for the dock mooring equipment. The accuracy of the measurement results is high, and it is suitable for most of the domestic sloping wharves at present. The whole set of equipment is simple and light, easy to carry and install, and the equipment can be reused. Besides the permanent wharf to avoid the cable breaking accident of the barge, it can also be rotated to the wharf in the jurisdiction to optimize the mooring system or to carry out the theoretical research of the mooring system.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U653.2
[Abstract]:With the completion and operation of the three Gorges Project, the changes of hydrological conditions and the large scale of ships in Chongqing have put forward higher requirements for the mooring and retaining facilities of barges on sloping wharves. However, the mooring load mechanism of the barge of sloping wharf is quite complicated. In addition to the environmental factors such as wind, wave and current, it is also related to the ship's tonnage, ship type, deadweight, berth water depth, cable arrangement mode, and the technical condition of the cable. A series of factors are related to the interaction between barges and berthing ships. The applicability of mooring system theory and cable load calculation method to the barge of sloping wharf needs to be discussed. Although mature mooring monitoring system has been developed abroad, the existing sloping wharf barges are not able to be used directly. In order to avoid the cable breakage of barges in sloping wharves and the serious consequences such as overturning or losing control of barges, the mechanical and mooring characteristics of barges mooring system are deeply analyzed in this paper. This paper discusses the existing calculation methods of cable load and its applicability to the barge of sloping wharf, analyzes the influencing factors of the ship's cable load, analyzes the influencing factors and the correction of the cable load measured by the vibration frequency method. A practical mooring load measurement technique for barges is put forward, the feasibility of the measurement technology is verified by field test, the mooring load monitoring and warning system based on vibration frequency method is designed, and the frequency spectrum is analyzed. The key problems such as the determination of early warning value, emergency response plan, monitoring and warning system equipment and flow are expounded. Vibration frequency method not only has the advantages of miniaturization of test instruments, easy to carry, easy to install and can be used repeatedly, but also has high testing accuracy, so it has become the most suitable method for measuring the load of cables in service of barges of sloping wharves. Considering the influence of cable slope, bending stiffness, sag, constraint conditions at both ends, the additional mass of sensor and the change of ambient temperature, the influence can be eliminated by the modified formula, and the measurement precision can be further improved. The field measured results also prove that the vibration frequency method can realize the reliable measurement of the cable load of the slope wharf, and the mooring cable load monitoring and warning system of the sloping wharf lighter designed from this method also has a high practical value. Based on the vibration frequency method, the system does not rely on fast decoupling hooks to measure the cable load, and does not need professional modification for the dock mooring equipment. The accuracy of the measurement results is high, and it is suitable for most of the domestic sloping wharves at present. The whole set of equipment is simple and light, easy to carry and install, and the equipment can be reused. Besides the permanent wharf to avoid the cable breaking accident of the barge, it can also be rotated to the wharf in the jurisdiction to optimize the mooring system or to carry out the theoretical research of the mooring system.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U653.2
【參考文獻】
相關(guān)期刊論文 前10條
1 段波,曾德榮,盧江;關(guān)于斜拉橋索力測定的分析[J];重慶交通學(xué)院學(xué)報;2005年04期
2 邱占芝;劉春玲;;碼頭系泊實時監(jiān)控可視化系統(tǒng)的設(shè)計與實現(xiàn)[J];大連交通大學(xué)學(xué)報;2010年05期
3 李向群;多點系泊船舶在波浪中的運動及其系泊力[J];交通部上海船舶運輸科學(xué)研究所學(xué)報;1999年01期
4 秦子君;魏昌理;;纜繩載荷監(jiān)測系統(tǒng)在開敞式碼頭的應(yīng)用與分析[J];水運工程;2007年09期
5 魏昌理;;在大型開敞式碼頭建立纜繩拉力、護舷壓力監(jiān)控預(yù)警系統(tǒng)的必要性[J];水運工程;2007年09期
6 任偉新;陳剛;;由基頻計算拉索拉力的實用公式[J];土木工程學(xué)報;2005年11期
7 周世良;李泳龍;李怡;鄭曉s
本文編號:2269430
本文鏈接:http://www.wukwdryxk.cn/kejilunwen/jiaotonggongchenglunwen/2269430.html
最近更新
教材專著