政府投資項(xiàng)目代建制風(fēng)險(xiǎn)管理研究
發(fā)布時(shí)間:2018-06-06 11:44
本文選題:政府投資項(xiàng)目 + 代建制。 參考:《西安科技大學(xué)》2015年碩士論文
【摘要】:隨著我國(guó)加入WTO和全社會(huì)經(jīng)濟(jì)的不斷發(fā)展,特別是政府對(duì)大型項(xiàng)目的投資和興建,使得項(xiàng)目的建設(shè)模式越來越得到人們的關(guān)注,新型的代建制模式以其特有的優(yōu)越性吸引了大批專家學(xué)者和管理者。由于政府投資項(xiàng)目涉及金額巨大,社會(huì)影響力強(qiáng),再加上其中錯(cuò)綜復(fù)雜的關(guān)系和近年來突發(fā)事件的防不勝防,代建制的風(fēng)險(xiǎn)管理問題一直是困擾投資項(xiàng)目發(fā)展的關(guān)鍵性難題。因此,對(duì)政府投資項(xiàng)目代建制風(fēng)險(xiǎn)管理的研究和探討具有非常大的理論和現(xiàn)實(shí)意義。本文結(jié)合國(guó)外和我國(guó)政府投資項(xiàng)目代建制的發(fā)展情況,從政府投資項(xiàng)目、風(fēng)險(xiǎn)管理、代建制的相關(guān)理論入手,按照代建項(xiàng)目風(fēng)險(xiǎn)識(shí)別、風(fēng)險(xiǎn)分析的風(fēng)險(xiǎn)管理邏輯體系,歸納出在具體的代建實(shí)踐過程中,出現(xiàn)的各種風(fēng)險(xiǎn)因素,并應(yīng)用風(fēng)險(xiǎn)識(shí)別的方法,通過專家意見法分析風(fēng)險(xiǎn)因素,并歸類為一、二階因素層次結(jié)構(gòu),構(gòu)建了風(fēng)險(xiǎn)因素指標(biāo)體系,再應(yīng)用層次分析法和模糊綜合評(píng)價(jià)法,得到政府投資項(xiàng)目代建制風(fēng)險(xiǎn)管理模型。同時(shí),通過案例實(shí)證分析,將此模型用于實(shí)際的代建項(xiàng)目,結(jié)論表明此模型是科學(xué)合理的,所得的結(jié)論也是可靠的。最后,文章根據(jù)理論和實(shí)踐的相結(jié)合的方式、以及模型所得的結(jié)論,提出有效的風(fēng)險(xiǎn)管理應(yīng)對(duì)建議,為完善代建制風(fēng)險(xiǎn)管理制度和提高代建制風(fēng)險(xiǎn)管理效率提供一定的參考。
[Abstract]:With China's entry into WTO and the continuous development of the whole society and economy, especially the investment and construction of large-scale projects by the government, more and more attention has been paid to the construction mode of the projects. The new agent system model attracts a large number of experts and managers for its unique advantages. Due to the huge amount of money involved in government investment projects, strong social influence, and the intricate relationship between them and the unexpected events in recent years, the risk management problem of agent system has always been a key problem puzzling the development of investment projects. Therefore, it is of great theoretical and practical significance to study and discuss the risk management of government investment projects. This paper combines the development of foreign and Chinese government investment projects, starting with the relevant theories of government investment projects, risk management and agent construction, and according to the risk identification and risk analysis logic system of agent construction projects. All kinds of risk factors appear in the concrete practice of agency construction are summarized, and the risk factors are analyzed by expert opinion method, and classified into the first and second order factor hierarchy structure, and the index system of risk factors is constructed by using the method of risk identification, and the expert opinion method is used to analyze the risk factors, which are classified as the hierarchical structure of first and second order factors. Then the risk management model of government investment project is obtained by using AHP and fuzzy comprehensive evaluation method. At the same time, through the case study, the model is applied to the actual construction project. The conclusion shows that the model is scientific and reasonable, and the conclusion is also reliable. Finally, according to the combination of theory and practice, as well as the conclusion of the model, the paper puts forward some effective risk management suggestions, which provides a certain reference for perfecting the system of risk management and improving the efficiency of agent system risk management.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:F283
,
本文編號(hào):1986408
本文鏈接:http://www.wukwdryxk.cn/jingjilunwen/jingjiguanlilunwen/1986408.html
最近更新
教材專著