城市生活污水處理廠電氣和控制系統(tǒng)的節(jié)能優(yōu)化研究
[Abstract]:Urban sewage treatment plant is the most effective and important way to solve the water pollution problem. It has remarkable social, economic and environmental benefits. However, due to the consideration of the advanced nature and stability of the treatment process and the project investment in the construction process, the influence of high energy consumption on the subsequent operation cost of the wastewater treatment plant is ignored. As a result, many sewage treatment plants are under great pressure on local finance after completion, and some sewage treatment plants can not operate normally because of the high operating cost. Based on the analysis of the energy consumption composition and energy consumption distribution during the operation of the wastewater treatment plant, this paper puts forward the energy saving optimization design method of the electric and automatic control system in the design stage of the sewage treatment plant project, and verifies it through the Wulanhaote East District sewage Plant Project. Obvious energy saving effect has been achieved. The main conclusions of this paper are as follows: (1) the wastewater treatment plant is divided into pretreatment unit, biochemical treatment section process unit and sludge treatment stage process unit according to the process unit. Among them, the energy consumption of pretreatment stage accounts for about 18% of the energy consumption of the whole plant, the energy consumption of biological treatment section accounts for 5570 of the energy consumption of the whole plant, and the energy consumption of sludge treatment section accounts for 8% and 10% of the energy consumption of the whole plant. Sewage lifting and aeration systems are the two most energy-consuming links in the plant. About 80% of the power consumption in the whole plant. (2) the optimal design of energy saving in the electric system of sewage treatment plant should include: reasonably determining the working system of the equipment and optimizing the load calculation algorithm for selecting the demand coefficient; Select the type of energy-saving transformer, reasonably determine the capacity selection, optimize the operation mode, according to the load distribution, optimize the substation location layout; Power factor and harmonic suppression are improved by selecting power equipment, low voltage side centralized reactive power compensation and transformer wiring, and low loss cable is selected to optimize distribution route. Adopt high efficiency motor, soft start and frequency conversion speed regulation means to reduce the equipment running energy consumption; Select high-efficiency energy-saving lamps, reasonable distribution of light, reasonable selection of illumination, optimization control to reduce the energy consumption of lighting. (3) the optimal design of energy saving of automatic control system of sewage treatment plant should be mainly based on the control scale and control requirements of the sewage plant control system. At present, (DCS) and (FCS); are mainly used in the control system of wastewater treatment plant in China, which is based on distributed control system (DCS) and fieldbus control system (FCS);). The energy saving optimization design of automatic control system in preprocessing section includes grid level difference control, polling control of sewage lifting pump group and variable frequency speed regulation control, and management of energy saving methods, such as low water flow at night, low speed operation or stop operation of water pump, Make full use of water storage capacity to maintain high water level and reduce head loss. Energy saving optimization of automatic control system in biological treatment section includes continuous control of biochemical pool process equipment, optimization of treatment efficiency of biochemical tank, frequency conversion control of digestible liquid reflux pump and frequency conversion control of blower on demand for gas supply. The energy saving optimization design of automatic control system of sludge treatment section includes sludge level control and automatic control of sludge dewatering machine.
【學(xué)位授予單位】:北京建筑大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:X799.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王熹;王湛;楊文濤;席雪潔;史龍?jiān)?董文月;張倩;周躍男;;中國水資源現(xiàn)狀及其未來發(fā)展方向展望[J];環(huán)境工程;2014年07期
2 褚曉輝;;減排亦要節(jié)能——城市生活污水處理廠電氣設(shè)計(jì)中的節(jié)能分析[J];低碳世界;2014年09期
3 宋連朋;魏連雨;趙樂軍;董興震;朱雁伯;;我國城鎮(zhèn)污水處理廠建設(shè)運(yùn)行現(xiàn)狀及存在問題分析[J];給水排水;2013年03期
4 徐衛(wèi)東;張蕾;付業(yè)興;鄭效文;江釗;;污水處理廠電氣節(jié)能措施探討[J];中國給水排水;2012年02期
5 劉韜;;污水處理智能控制的發(fā)展現(xiàn)狀研究[J];中國高新技術(shù)企業(yè);2009年17期
6 陳征晶;;城市污水處理廠自控系統(tǒng)的優(yōu)化設(shè)計(jì)[J];福建輕紡;2009年08期
7 金昌權(quán);汪誠文;曾思育;何苗;;污水處理廠能耗特征分析方法與節(jié)能途徑研究[J];給水排水;2009年S1期
8 張芳;;污水處理系統(tǒng)的節(jié)能途徑[J];中華紙業(yè);2007年09期
9 趙中敏;張秋云;楊廣才;;PLC控制系統(tǒng)設(shè)計(jì)[J];機(jī)床電器;2007年02期
10 李振勝;;在工業(yè)自動化生產(chǎn)過程中PLC控制系統(tǒng)的設(shè)計(jì)方法[J];工業(yè)儀表與自動化裝置;2007年02期
相關(guān)碩士學(xué)位論文 前1條
1 崔宗超;基于現(xiàn)場總線的城市污水處理自動控制系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];重慶大學(xué);2006年