論政府實(shí)施部門(mén)PPP項(xiàng)目合同風(fēng)險(xiǎn)管理——基于不完全契約理論的分析
[Abstract]:The risk management of the PPP project contract should be based on its incompleteness. Under the framework of incomplete contract, the government should realize the transformation from passive supervision to active management to the risk management of PPP project contract, in order to solve the problem of information asymmetry as the core, and take dynamic negotiation and re contracting as the basic tool, through expectation. When the risk occurs, the responsibility allocation between the government and the social capital is rebalanced to maintain a smooth and effective operation of the project. Dynamic negotiation and the successful conclusion of the contracting parties are conditional on the understanding of the meaning of the contract and the full sharing of information. Risk management intervention time determination, management and operation framework design, etc., should be effective in facilitated dynamic negotiation and re contracting.
【作者單位】: 安徽省社會(huì)科學(xué)院法學(xué)研究所;四川省社會(huì)科學(xué)院社會(huì)科學(xué)研究雜志社;
【分類(lèi)號(hào)】:D922.1
【相似文獻(xiàn)】
相關(guān)會(huì)議論文 前3條
1 帥萍;孟憲忠;;不完全契約:理論假設(shè)、約束及發(fā)展[A];2005中國(guó)制度經(jīng)濟(jì)學(xué)年會(huì)精選論文(第二部分)[C];2005年
2 萬(wàn)莉;羅怡芬;;企業(yè)社會(huì)責(zé)任的均衡模型——基于利益相關(guān)者和不完全契約理論[A];全球化與中國(guó)經(jīng)濟(jì) 創(chuàng)新·發(fā)展·安全——上海市社會(huì)科學(xué)界第四屆學(xué)術(shù)年會(huì)文集(2006年度)(經(jīng)濟(jì)·管理學(xué)科卷)[C];2006年
3 李進(jìn)中;黃少安;;哈特-莫爾模型介紹與評(píng)析[A];2011年(第九屆)“中國(guó)法經(jīng)濟(jì)學(xué)論壇”論文集[C];2011年
相關(guān)重要報(bào)紙文章 前1條
1 聶輝華 中國(guó)人民大學(xué)經(jīng)濟(jì)學(xué)院;不完全契約理論的來(lái)龍去脈[N];中國(guó)社會(huì)科學(xué)報(bào);2011年
相關(guān)碩士學(xué)位論文 前3條
1 李輝婕;基于不完全契約理論的人力資源管理外包決策分析[D];上海財(cái)經(jīng)大學(xué);2005年
2 李亞磊;基于不完全契約理論的政府代建制項(xiàng)目激勵(lì)約束模型研究[D];大連理工大學(xué);2014年
3 肖智釗;陽(yáng)光燈飾公司后向一體化不完全契約理論的分析[D];華南理工大學(xué);2013年
,本文編號(hào):2166500
本文鏈接:http://www.wukwdryxk.cn/falvlunwen/xingzhengfalunwen/2166500.html