獅子嶺隧道下穿龍峰山莊別墅密集區(qū)爆破減震綜合技術試驗研究
[Abstract]:In view of blasting shock absorption and safety construction of many kinds of intersecting tunnel in mountainous area, taking the Liangling tunnel project of Jinwen railway as the background, the safe and rapid construction technology of large section, shallow buried depth, multi-interference and multi-crossing tunnel is studied. The main work and research results are as follows: (1) on the basis of summing up the construction experience, a set of safe and rapid construction techniques for the existing construction (construction) under the tunnel and for the existing building (construction) are formed. (2) numerical simulation analysis of blasting construction in the dense area of Longfeng Villa under the Jishongling Tunnel shows that, In the course of blasting excavation, the maximum principal stress of surrounding rock appears in the arch and inverted arch of the tunnel, and the minimum principal stress usually occurs at the arch of the arch near the blasting surface. At the same time, the plastic zone of the tunnel is mainly concentrated on both sides of the arch shoulder. With the excavation, the plastic zone diffuses from the arch shoulder through the arch waist to the arch foot. After excavation, the plastic zone is mainly concentrated in the area from the arch waist to the arch foot on both sides of the tunnel. The range of plastic zone is related to the span of tunnel. (3) aiming at the influence of blasting construction on the existing buildings above the new tunnel, The proposed annular stratified and horizontal layered blasting damping models have great effect on reducing the disturbance of the existing building (construction) on the ground surface during the tunnel blasting construction. Under the condition of this model, the surface settlement is less affected by blasting excavation, which shows that blasting damping and reinforcement design play a great role. (4) Real-time monitoring of blasting vibration response following construction shows that, In the complex construction environment, the vibration absorption models of annular layered and horizontal layered blasting are presented, which embody the design concept of double coupling of shock absorption and isolation, and reach the expected goal.
【學位授予單位】:西安建筑科技大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:U455.4
【參考文獻】
相關期刊論文 前10條
1 牛澤林;吳煥通;綦彥波;代亞雷;黃捷勝;王超;向宇;;大斷面淺埋隧道下穿既有建筑群爆破減震模型試驗與研究[J];現代隧道技術;2016年04期
2 Xie Tao;Lu Jun;Ren Yuexia;Zhao Minyuan;;Analysis on Apparent Resistivity Variations of Garzê Station before the 2013 Lushan M_S 7. 0 Earthquake[J];Earthquake Research in China;2014年03期
3 李峰;;朔州隧道上軟下硬土石分界微差減震靜態(tài)爆破施工技術[J];鐵道建筑技術;2013年S2期
4 阮清林;;淺埋隧道地表密集建(構)筑物評估及對策[J];現代隧道技術;2012年03期
5 黃明利;孟小偉;譚忠盛;阮清林;;淺埋隧道下穿密集房屋爆破減震技術研究[J];地下空間與工程學報;2012年02期
6 李新志;李術才;李樹忱;;淺埋大跨度隧道施工過程地表沉降變形特征研究[J];巖石力學與工程學報;2011年S1期
7 梅東冬;王維高;;蘭渝鐵路桐子林隧道上跨既有隧道控制爆破施工技術[J];現代隧道技術;2011年02期
8 李旭東;白海峰;周志順;;地面建筑物控制爆破的淺埋隧道暗挖方法研究[J];鐵道工程學報;2011年01期
9 朱澤兵;張永興;劉新榮;趙寶云;;特大斷面車站隧道爆破開挖對地表建筑物的影響[J];重慶大學學報;2010年02期
10 申玉生;高波;王志杰;孟凡君;;復線隧道施工爆破對既有隧道結構的影響分析[J];地下空間與工程學報;2009年05期
相關博士學位論文 前2條
1 中國生;基于小波變換爆破振動分析的應用基礎研究[D];中南大學;2006年
2 陽生權;爆破地震累積效應理論和應用初步研究[D];中南大學;2002年
相關碩士學位論文 前10條
1 醋經緯;小凈距交叉隧道爆破振動控制技術研究[D];蘭州交通大學;2014年
2 孟棟;鐵路立體交叉隧道施工爆破震動影響與分區(qū)研究[D];中南大學;2013年
3 蘇宇;隧道爆破振動對地表及臨近建筑物影響研究[D];中國海洋大學;2012年
4 萬江濤;靠界控制爆破在白云鄂博鐵礦中的應用研究[D];內蒙古科技大學;2012年
5 羅正;城市淺埋大跨隧道爆破振動監(jiān)測與控制技術研究[D];中南大學;2011年
6 崔可佳;淺埋城市隧道爆破施工對地表及鄰近既有隧道振動影響的研究[D];重慶大學;2008年
7 汪振偉;城市連拱隧道施工地表沉降研究[D];重慶交通大學;2008年
8 喬憲隊;爆破震動對鄰近隧洞的動力響應分析[D];中南大學;2007年
9 黃寶龍;復雜環(huán)境下小間距隧道施工控制關鍵技術研究[D];北京交通大學;2006年
10 王俊平;爆破地震波對周圍建筑物影響的分析[D];武漢理工大學;2005年
,本文編號:2361011
本文鏈接:http://www.wukwdryxk.cn/kejilunwen/daoluqiaoliang/2361011.html