寬幅箱梁橋施工監(jiān)控和剪力滯效應分析
[Abstract]:During the construction of wide box girder bridge, the transverse deformation of the section is easy to occur, and the difficulty of linear control is increased, and the maximum stress state of the main beam section occurs in the construction stage. Under the influence of shear lag effect, safety accidents are easy to occur in the construction process. Based on the above considerations, this paper takes Fugou Dongguan Bridge, a single box and five chamber continuous beam bridge with a width of 26.5m, as the background project to carry out construction monitoring, and studies the variation law of shear lag in the construction process. The main work completed and the main conclusions obtained are as follows: (1) the single beam model and beam model are established by finite element software Midas/Civil, and the spatial entity element model is established by finite element software Midas/Fea, which provides theoretical data support for the construction monitoring of Dongguan Bridge in Fugou County. (2) the pouring concrete, tensioned prestress and bridge closure in the construction process of Dongguan Bridge in Fugou County are discussed. The influence of system transformation and other construction steps on the section stress and shear lag effect of the main beam is put forward. The stress of the main beam produced by different construction steps shows different "whole" and "local" shear lag effects at the top and bottom plate, and the variation law of shear lag of the cantilever root box girder section in the whole construction process is analyzed. It is concluded that in the process of cantilever construction, the shear lag effect of the section of the main beam before and after pouring concrete increases, and the shear lag effect of the section of the main beam increases, and the shear lag effect of the section of the main beam before and after pouring concrete is weakened by pouring concrete, and the shear lag effect of the section of the main beam before and after the tension prestressed beam is weakened, and the shear lag effect of the bottom plate is increased. The influence of bridge closure and system transformation on shear lag effect is related to beam position. With the construction going on, the compression stress of box girder at the root of cantilever increases and the shear lag effect weakens. (3) according to the characteristics of Dongguan Bridge in Fugou County, the bridge construction monitoring scheme is worked out, and the construction process of Dongguan Bridge in Fugou County is monitored by adaptive control method: the alignment of the main beam is controlled by reasonably setting the elevation of vertical formwork in each stage to ensure the alignment of the main beam in the construction process; By comparing the measured stress results with the theoretical stress results, the reasonable and safe stress of the main beam in the construction process is guaranteed. The monitoring results show that the alignment of the Dongguan Bridge in Fugou County is smooth and achieves the goal of alignment control, and the main beam is in a safe and reliable state during the construction process, and the stress after the completion of the bridge meets the requirements of the code and has a certain safety reserve.
【學位授予單位】:鄭州大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:U445.4
【相似文獻】
相關期刊論文 前10條
1 覃嘉仕,盧海林;薄壁曲線箱梁通用單元剪力滯效應分析[J];長江大學學報(自科版);2004年Z1期
2 王玲;郄才富;;大跨度預應力混凝土連續(xù)箱梁剪力滯效應研究[J];甘肅科技;2010年02期
3 鄧德員;陳清波;李新平;;比擬桿法在邊箱形主梁剪力滯效應分析中的應用研究[J];科學技術與工程;2012年26期
4 張巧慧;楊先江;孫慧媛;;某橋梁段剪力滯效應研究與分析[J];價值工程;2013年03期
5 盧重陽;;薄壁簡支箱梁剪力滯效應參數(shù)研究[J];蘭州工業(yè)學院學報;2013年02期
6 譚中法;;淺談對剪力滯效應的認識[J];才智;2013年15期
7 丁志全;;負剪力滯效應的研究現(xiàn)狀[J];科技資訊;2013年24期
8 李建國;孫逢坤;徐良;;均布荷載作用下簡支箱梁的剪力滯效應分析[J];山西建筑;2014年05期
9 鄭宇;;剛構-連續(xù)組合單箱室橋剪力滯效應分析[J];北方交通;2014年02期
10 于傳君,孫玉武;連續(xù)彎箱梁橋剪力滯效應分析[J];東北公路;2002年01期
相關會議論文 前10條
1 吳海林;季文玉;許克賓;;箱梁剪力滯效應影響參數(shù)分析[A];第九屆全國結構工程學術會議論文集第Ⅱ卷[C];2000年
2 趙曼;閆貴平;王新敏;;雙線整孔簡支箱梁的剪力滯效應分析[A];可持續(xù)發(fā)展的中國交通——2005全國博士生學術論壇(交通運輸工程學科)論文集(下冊)[C];2005年
3 藺鵬臻;劉世忠;;大寬跨比連續(xù)鋼箱梁橋的剪力滯效應研究[A];第十八屆全國橋梁學術會議論文集(下冊)[C];2008年
4 王常峰;朱東生;陳興沖;;雙室箱梁橋剪力滯效應分析[A];第十二屆全國結構工程學術會議論文集第Ⅲ冊[C];2003年
5 張士鐸;張啟傳;;錢塘江三橋恒載箱梁剪力滯效應分析[A];中國土木工程學會橋梁及結構工程學會第十二屆年會論文集(下冊)[C];1996年
6 梁田;董軍;;預應力對曲線矮塔斜拉橋剪力滯效應影響分析[A];第22屆全國結構工程學術會議論文集第Ⅰ冊[C];2013年
7 周偉;蔣益飛;;斜拉橋最大雙懸臂施工階段主梁剪力滯效應分析[A];江蘇省公路學會優(yōu)秀論文集(2006-2008)[C];2009年
8 張立明;楊昀;徐賀文;;高墩大跨彎橋剪力滯特性分析[A];中國公路學會橋梁和結構工程分會2004年全國橋梁學術會議論文集[C];2004年
9 徐文明;袁端才;蔣志剛;;夾層復合材料薄壁箱形梁剪力滯效應數(shù)值分析[A];第17屆全國結構工程學術會議論文集(第Ⅱ冊)[C];2008年
10 楊允表;石志源;石洞;;復合材料與混凝土復合箱梁的剪力滯效應[A];中國土木工程學會橋梁及結構工程學會第十三屆年會論文集(下冊)[C];1998年
相關重要報紙文章 前2條
1 本報記者 陳果;廣州西塔運用施工監(jiān)控技術[N];廣東建設報;2008年
2 袁弘;請“監(jiān)工”保質!办n”建大橋[N];成都日報;2007年
相關博士學位論文 前10條
1 李艷鳳;單索面PC斜拉橋主梁剪力滯效應分析研究[D];東北大學;2014年
2 程海根;薄壁箱梁剪力滯效應理論分析與試驗研究[D];西南交通大學;2003年
3 王慧東;薄壁箱梁剪力滯效應及其對橋梁行為影響的研究[D];西南交通大學;2007年
4 藺鵬臻;混凝土箱梁剪力滯效應的分析理論與應用研究[D];蘭州交通大學;2011年
5 張永健;考慮剪力滯效應的薄壁結構特性分析[D];長安大學;2007年
6 吳高峰;大跨度箱形梁結構剪力滯效應及非線性抗震性能研究[D];北京化工大學;2005年
7 喬朋;斜拉橋扁平鋼箱主梁剪力滯效應研究[D];長安大學;2009年
8 張玉紅;薄壁箱梁剪力滯效應的理論分析與試驗研究[D];蘭州交通大學;2011年
9 盧海林;預應力混凝土曲線箱型梁剪力滯效應理論分析與試驗研究[D];天津大學;2007年
10 周月娥;箱型梁剪力滯效應及其可靠度隨機有限元分析[D];廣西大學;2013年
相關碩士學位論文 前10條
1 楊柄楠;寬幅箱梁橋施工監(jiān)控和剪力滯效應分析[D];鄭州大學;2017年
2 付志方;寬箱連續(xù)梁橋施工監(jiān)控及剪力滯效應研究[D];鄭州大學;2015年
3 王金周;單箱三室預應力混凝土連續(xù)寬箱梁橋剪力滯效應分析[D];長安大學;2015年
4 扈軒誠;單箱三室波紋鋼腹板預應力混凝土箱梁剪力滯效應與腹板剪力分配研究[D];長安大學;2015年
5 寧舟;雙邊箱主梁拱塔斜拉橋剪力滯效應及施工控制研究[D];長沙理工大學;2014年
6 鄧達;薄壁變截面混凝土曲線箱梁施工階段剪力滯效應分析[D];長沙理工大學;2014年
7 陳禎;縱向預應力對箱梁剪力滯效應影響研究[D];蘭州交通大學;2015年
8 李映田;預應力混凝土連續(xù)梁的施工監(jiān)控與剪力滯效應研究[D];蘭州交通大學;2015年
9 劉亮;特殊支承箱梁剪力滯效應的有限元分析[D];蘭州交通大學;2015年
10 馬鉍淇;預應力作用引起的箱梁剪力滯效應研究[D];蘭州交通大學;2015年
,本文編號:2503356
本文鏈接:http://www.wukwdryxk.cn/kejilunwen/daoluqiaoliang/2503356.html