基于BIM和WEB的隧道動(dòng)態(tài)施工監(jiān)測(cè)信息系統(tǒng)研究
[Abstract]:Compared with the general above-ground engineering, the tunnel, as a hidden project, has been faced with a series of problems, such as complex geological bodies, difficulty in obtaining information, complicated and abstract data, and great risk in the construction process. In order to solve the above problems, this paper combines the advanced building information model (BIM), Internet of things, cloud platform and other technologies with the traditional tunnel construction concept, and independently develops the tunnel dynamic construction information system based on BIM and cloud platform. And carry on the engineering application. The main research contents are as follows: (1) the rapid parametric modeling method of tunnel BIM is studied. The tunnel family component library of IFC standard is established by Revit, and the BIM model of geological body is established by using the geological modeling program developed by ourselves. Based on the VTK dynamic link library of C # language, the establishment program of geological body BIM model is compiled independently. The 3D model data format of VTK is studied, and the format conversion between IFC and VTK is realized. through WebGL (Web Graphics Library) 3D drawing standard and graphic loading technology, the WEB display of BIM model is realized. (2) based on Visual studio and SQLsever database, A cloud platform early warning system for tunnel construction monitoring information based on C / S (Client/Server) and B / S (Browse/Server) shared mode is designed and developed. The system uses wireless remote communication technology to collect sensor information of all kinds of monitoring projects, and publishes data through WEB. Any computer and mobile client can browse the information through Internet. When the alarm exceeds the limit, the system can send alarm information to the mobile phone. In addition, the IFC expression method of tunnel monitoring information is established, and finally the construction of tunnel BIM information database based on IFC standard is completed. (3) on the basis of this research, the risk mechanism and risk factors of tunnel construction are further explored. The quantitative parameters of risk factors are designed, and the risk assessment method of tunnel construction based on fuzzy comprehensive evaluation is established. On the basis of the established BIM model, the risk factors and evaluation parameters are expressed based on IFC standard, and the risk management evaluation program based on BIM database is compiled. The tunnel construction information system based on BIM and cloud platform is formed. (4) the tunnel construction information system developed by ourselves is applied to Dalian Bohai Road Dadongshan Highway Tunnel and Intercity Rail Transit Jinpu Railway Tunnel. Through the BIM model expression, monitoring information cloud collection and risk assessment calculation of the key sections of the tunnel, the construction process of the tunnel is analyzed quickly, the risk is prevented and the scheme is adjusted in time, and good results are obtained. It shows that the development method and program of this system are successful and can effectively improve the safety management level of tunnel construction.
【學(xué)位授予單位】:大連海事大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:U456.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 丁建洋;付后國(guó);應(yīng)宇墾;;軌道交通工程Revit快速建模工具集開(kāi)發(fā)[J];電腦知識(shí)與技術(shù);2016年10期
2 徐照;徐夏炎;李啟明;張星;;基于WebGL與IFC的建筑信息模型可視化分析方法[J];東南大學(xué)學(xué)報(bào)(自然科學(xué)版);2016年02期
3 馬志明;李嚴(yán);李勝波;;IFC架構(gòu)及模型構(gòu)成分析[J];四川兵工學(xué)報(bào);2014年11期
4 楊科;康登澤;車(chē)傳波;徐鵬;;基于BIM的碰撞檢查在協(xié)同設(shè)計(jì)中的研究[J];土木建筑工程信息技術(shù);2013年04期
5 呂玉惠;俞啟元;張尚;;基于BIM的施工項(xiàng)目多要素集成管理信息系統(tǒng)研究[J];建筑經(jīng)濟(jì);2013年08期
6 何清華;潘海濤;李永奎;錢(qián)麗麗;;基于云計(jì)算的BIM實(shí)施框架研究[J];建筑經(jīng)濟(jì);2012年05期
7 趙彬;王友群;牛博生;;基于BIM的4D虛擬建造技術(shù)在工程項(xiàng)目進(jìn)度管理中的應(yīng)用[J];建筑經(jīng)濟(jì);2011年09期
8 清華大學(xué)軟件學(xué)院BIM課題組;;中國(guó)建筑信息模型標(biāo)準(zhǔn)框架研究[J];土木建筑工程信息技術(shù);2010年02期
9 葉英;穆千祥;張成平;;隧道施工多元信息預(yù)警與安全管理系統(tǒng)研究[J];巖石力學(xué)與工程學(xué)報(bào);2009年05期
10 張強(qiáng)勇;陳曉鵬;劉大文;胡建忠;李杰;蔡德文;;巖土工程監(jiān)測(cè)信息管理與數(shù)據(jù)分析網(wǎng)絡(luò)系統(tǒng)開(kāi)發(fā)及應(yīng)用[J];巖土力學(xué);2009年02期
相關(guān)博士學(xué)位論文 前1條
1 張洋;基于BIM的建筑工程信息集成與管理研究[D];清華大學(xué);2009年
相關(guān)碩士學(xué)位論文 前7條
1 王超;基于BIM的監(jiān)測(cè)信息IFC表達(dá)與集成方法研究[D];哈爾濱工業(yè)大學(xué);2015年
2 龍騰;基于BIM的變截面橋體可視化施工技術(shù)應(yīng)用研究[D];武漢科技大學(xué);2015年
3 施建平;青島地鐵M3號(hào)線區(qū)間隧道施工安全風(fēng)險(xiǎn)評(píng)估[D];中國(guó)海洋大學(xué);2014年
4 方強(qiáng);基于WebGL的3D圖形引擎研究與實(shí)現(xiàn)[D];安徽大學(xué);2013年
5 馬小鋒;水底隧道風(fēng)險(xiǎn)評(píng)估體系及施工風(fēng)險(xiǎn)評(píng)估研究[D];西南交通大學(xué);2009年
6 宮志群;地鐵盾構(gòu)區(qū)間隧道施工風(fēng)險(xiǎn)分析及評(píng)價(jià)[D];天津大學(xué);2006年
7 邱方亮;基于B/S的檔案資料管理信息系統(tǒng)的研究和構(gòu)建[D];西北工業(yè)大學(xué);2004年
,本文編號(hào):2490407
本文鏈接:http://www.wukwdryxk.cn/kejilunwen/daoluqiaoliang/2490407.html